• <delect id="qmq0u"></delect>
  • Home NewsNews CenterSuccessful Power Generation of 11.94 MW Distributed Photovoltaic Power Generation Project Phase I
    Successful Power Generation of 11.94 MW Distributed Photovoltaic Power Generation Project Phase I
    ?Released on:23 January 2025
    source:China MCC5 Group
    release time:2025年06月06日
    view:89

    Recently, Yizheng Mingneng (Phase I) 11.94 MW distributed photovoltaic power generation project constructed by MCC5 was successfully connected to the grid at full capacity.

    The project is located on the roof of the plant of Jiangsu Tongzhou Warehouse Co., Ltd. in Yizheng City, Jiangsu Province, with a total installed capacity of 11.94 MW, a total area of about 75,000 square metres, and a total of 20,411 photovoltaic modules. After the project is put into operation, it is expected that the average annual power generation capacity will be 10.15 million kWh, and the total power generation capacity will be about 253.75 million kWh in 2025, which can provide sufficient clean electricity with good economic and social benefits, and help the Company realise energy conservation, emission reduction and low-carbon economic development.

    prev:Five achievements of MCC5 are evaluated as internationally advanced or domestically leading next:Xinjiang Lead-zinc Smelting Project is Ready for Material Commissioning
    亚洲无码不卡宅男在线,人妻专区无码一区二区,中文字幕制服丝袜有码,亚洲精品一级精品在线高清
  • <delect id="qmq0u"></delect>